GSG - Beyond the Numbers

Photo: Dual Spindle CNC ID/OD Grinder, GSG CT Facility

3.2. From Production Bottleneck to Next-Day Shipping Champion The strategic value of this investment is realized when its operational benefits are linked to GSG's commercial objectives. The goal of "improving next day shipping" is dependent on the ability to increase production output and build sufficient inventory. The efficiency gains from single-setup manufacturing are the direct enabler of this imperative. The increased speed and throughput will generate a substantial increase in production capacity, which can be allocated to building robust stock levels of high-volume, standard products. The ability to reliably offer "next-day shipping" is a powerful competitive weapon. For customers, who face high costs from equipment downtime, receiving a replacement gage overnight can be a decisive factor in purchasing decisions, building immense loyalty. The table below summarizes the projected impact of this transition.

Current State (Multi-Setup Process)

Future State (Single-Setup Multi-Axis)

Metric

Improvement

Strategic Impact

Avg. Setup Time per Part

"Increased machine uptime, higher throughput."

2.5 Hours

15 Minutes

>90%

Avg. Cycle Time per Unit

"Faster production, ability to respond to demand spikes."

45 Minutes

25 Minutes

44%

Made with FlippingBook Ebook Creator